BossHorn DIY Train Horn Gun Kit with 4 Trumpets for DeWalt – up to 150db
Introducing the BossHorn DIY Train Horn Gun Kit with 4 Trumpets for DeWaltyour ultimate solution for powerful, attention-grabbing sound. Engineered for compatibility with DeWalt 20V tools, this DIY kit delivers an impressive blast of up to 150db, thanks to
Introducing the BossHorn DIY Train Horn Gun Kit with 4 Trumpets for DeWaltyour ultimate solution for powerful, attention-grabbing sound. Engineered for compatibility with DeWalt 20V tools, this DIY kit delivers an impressive blast of up to 150db, thanks to its four high-performance metal trumpets and efficient compressor system. Whether you’re making a statement at an event or just having fun, this cordless train horn kit brings maximum volume and portability with simple installation.
Features
- All-Inclusive Kit: Includes everything needed to build an extremely loud cordless train horn from your own impact tool.
- Wide Compatibility: Designed to fit most brand-name drills perfectly. Minimal shell modification requiredsome may need slight grinding.
- Dual Activation Options: Comes with both a trigger button and a remote control for flexible use.
- Quad Trumpets: Features 4 powerful trumpets for a bold, distinctive sound.
- Brushless Drill Friendly: Can also be used with other brands of brushless drills.
- DIY-Friendly: Build it yourself with easeno need for complicated wiring or setup.
- Unmatched Loudness: Produces a booming train horn sound that grabs attention instantly.
What’s inside?
- Air horns assembly
- Air compressor
- Pre-built harness with remote signal receiver (not pictured)
- Remote Control
- Air pipe
- 2 screws
Installation
- Unscrew Clamp Shell: Carefully remove the outer shell of the drill.
- Remove Gears: Take out the internal gear mechanism.
- Remove Drill Motor: Detach and remove the motor.
- Remove Harness: Unplug and remove the existing wire harness.
- Fit Shell to Compressor: Modify or align the drill shell to fit the air compressor.
- Install New Harness: Insert and secure the new wire harness inside the shell.
- Connect Compressor: Wire the air compressor to the appropriate terminals.
- Test Compressor: Connect the battery and ensure the compressor runs properly.
- Reassemble Shell: Screw the clamp shell back together securely.
- Drill Mounting Holes: Drill 2 holes from the back side for bolt installation.
- Install Horn Mount: Attach the horn mount using 2 bolts.
- Connect Hose: Link the hose from the compressor to the horns.
- Ready to Blast: Enjoy your powerful new train horn!
Reviews
There are no reviews yet.