WESTCOTT DESIGNS 2023-2024 Toyota Sequoia FRONT ONLY Preload Collar Suspension Lift Kit SR5, Limited, Platinum, TRD Off-Road
All Westcott Designs products are call-to-make orders Made in USA in-house. Lead time varies from 3-4 weeks for raw finish kits to 4-6 weeks for black anodize finish kits. In some cases, for the latest year model, it can take up to 6-8 weeks.DescriptionWes
All Westcott Designs products are call-to-make orders Made in USA in-house. Lead time varies from 3-4 weeks for raw finish kits to 4-6 weeks for black anodize finish kits. In some cases, for the latest year model, it can take up to 6-8 weeks.
Description
Westcott DesignsFront Onlypreload collar lift kit for the all-new 2023-24 Toyota Sequoia! This kit features CNC machined lower preload collars, top shim plates and hard anodized black for a strong, durable finish. This kit gives you a full 3 of front lift using your factory shocks and springs and includes complete hardware for an easy install. This is NOT your traditional spacer lift kit, you retain your factory ride quality, factory suspension geometry and still able to align the vehicle to factory specs after install. It does NOT require new UCAs, and you can run up to a 35 tire without a Body Mount Chop.
These kits along with all Westcott products have been designed and built here in house Phoenix, AZ in the great USA!
Note: These new Sequoias share a lot of the same suspension components as the new platform Tundra. If you need help figuring out what kit fits your specific model, please contact us.
**No shocks are included with any preload collar lift kits**
*Not compatible with AVS equipped rear trucks, see complete kit listing for purchase
This kit provides the following lifts:
- 2023-24 Sequoia static suspension equipped trucks:3.0 (front lift)
Additional information
Weight | 15 lbs |
---|---|
Dimensions | 12 10 8 in |
Model |
Black Hitachi Shocks, Black Tokico Shocks, TRD Off-Road (Red Bilstein Shocks) |
Finish |
Raw Aluminum, Black Anodize |
Shipping / Service options for this product:
- Standard (Call-to-Make Raw Finish 3-4 wks / Black Anodize Finish 4-8 wks)
- Expedite (Call-to-Make Raw Finish 1-2 wks / Black Anodize Finish 2-3 wks). Some newer model might take up to 6 wks)
Reviews
There are no reviews yet.